E-BOP works:
Aster undertakes design to commissioning of Sub-Stations and switch yard works of Power plants all over India. The scope include HV Substation, Bus Ducts and/or Cable and connections, Transformers, Generator Circuit-breakers, Excitation Equipment, Power Plant Main, LV/MV Switchgear, LV-MCC Distribution, Switchgear, UPS System, Batteries/Inverters, Diesel Sets, and DCS System/Main Control.
Plant Electrification:
The work undertaken for Plant Electrification cover Conceptual studies and detailed engineering, Electrical Schemes & Single Line Diagrams, Sizing & Selection of Electrical Equipment, Metering & Protection Schemes, Indoor Switch gear distribution Boards and Cubicle, Control, Indication and Alarm Annunciation System, D.C. Control Power Supply Equipment, AC Auxiliary Power Supply Equipment, Optimized solutions for the selection of the plant automation system. Aster is committed to provide quality product and services to the customers. |