Aster Teleservices Private Limited Logo
 Telecom
 Transmission & Distribution
 Special Structures
 Poly Engineering Systems
 Pre Engineered Buildings
 International Business
 
 Manufacturing
        Facilities
Choutuppal
Cheriyala
Cherlapally Unit-I
Jedcherla-PEB
Jedcherla-PES
Raipur Unit-I
Raipur Unit-II
Vadodara
 
Manufacturing Facilities
 
Aster is equipped with the best of infrastructure and manufacturing facilities for towers and special structures. Since customer satisfaction is the benchmark we incessantly keep improving our technical expertise, processes and products. Aster Manufacturing Facility

Our manufacturing facilities are located at highly strategic locations, which is why our clients can save on transport costs and transit time for the products from the locations of their choice.

As a leading tower manufacturer in India, Aster can easily meet demands of our global customers through 6 independent tower manufacturing facilities with a total production capacity of 142,320 MT per annum.

Our shelter manufacturing unit at Jedcherla, Hyderabad is equipped with the latest machinery and facilities and has an annual production capacity of 12,000 units of Telecom Shelters per annum.

 
Choutuppal : Has a production capacity of 52,200 MT per annum for manufacturing of Transmission Towers, Telecom Towers, Broadcast Towers, Guyed Masts, Monopoles, High Masts (Lighting) and Windmills Towers installed with sophisticated CNC machines to attain accurate and consistent products.
Cheriyala : Has a capacity of 10,800 MT per annum for manufacturing and fabrication of Tubular & Angular Towers.
Cherlapally Unit-I : Has a production capacity of 30,000 MT per annum, for manufacturing of Telecom towers, Broadcast Towers, Guyed Masts, Monopoles, High Masts (Lighting), Windmills Towers and Railway structures.
Jedcherla - PEB : Has a capacity of 50,000 MT per annum.
Jedcherla - PES : Has a production capacity of 12,000 Telecom Shelters per annum and caters to needs of the Telecom market.
Raipur Unit-I : Has a production capacity of 21,000 MT per annum , for manufacturing of Telecom Towers , Transmission Towers, and it mainly caters to the north and central Indian market.
Raipur Unit-II : Has a production capacity of 24000 MT per annum for manufacturing of Telecom Towers , Transmission Towers.
Vadodara : Has a production capacity of 4,320 MT per annum and mainly caters to the West Indian market.
 
  © 2010 Aster Teleservices Private Limited. All Rights Reserved. Sitemap  |  Privacy Policy